![]() |
Skydeck Formwork |
Description
With the SKYDECK drophead system, striking can be carried out after only one day (depending on the slab thickness and strength of the concrete). The drophead is released with a hammer blow which causes the formwork to drop 60 mm (panels and main beams). The panels can be separated easily from the concrete and immediately used for the next cycle.
Sample Pictures
![]() |
![]() |
![]() |



